Condensed from a real completed-run analysis
Next check: verify dosing at flip
Cultivar A · first tracked run · 90 plants · 24 lights
- What was recorded
- An operator note recorded that Part A dosing was off for the first 10 days after flip.
- What the run showed
- A 2.55 lb/light baseline with weak density. Later feed averaged roughly 32% above the recorded recipe target, and runoff EC rose through flower.
- What limits the conclusion
- Early heat, VPD, and a new propagation source overlapped the dosing interruption. This first tracked run cannot isolate their effects.
- What to review next
- A day-of-flip dosing verification checklist to keep the documented miss from recurring.
Possible contributor, not causal proof. The record documents the interruption, not how much yield it cost.
Editorially condensed; not the in-app report layout. Names and select values changed for privacy. The full report includes score breakdowns, strengths, opportunities, phase analysis, and data-quality notes.